Seeking Alpha
2022-01-19 11:26:50

BIT Mining provides business and operational update

BIT Mining (NYSE:BTCM) announced its progress in the construction and buildout of its Ohio mining site in North America; in collaboration with its partner, the company has achieved ~50 MW of power capacity at the Ohio mining site. Currently, the company has 532.8 PH/s theoretical maximum Bitcoin computing power in North America, of which 344.7 PH/s has been deployed; 292.7 PH/s theoretical maximum Bitcoin computing power in Kazakhstan,of which 146.8 PH/s has been deployed; 4,800.0 GH/s theoretical maximum Ethereum computing power in Hong Kong,of which 4,747.2 GH/s has been deployed. The company reports estimated daily Bitcoin production of ~2.56 BTC while estimated daily Ethereum production of ~72.29 ETH.

获取加密通讯
阅读免责声明 : 此处提供的所有内容我们的网站,超链接网站,相关应用程序,论坛,博客,社交媒体帐户和其他平台(“网站”)仅供您提供一般信息,从第三方采购。 我们不对与我们的内容有任何形式的保证,包括但不限于准确性和更新性。 我们提供的内容中没有任何内容构成财务建议,法律建议或任何其他形式的建议,以满足您对任何目的的特定依赖。 任何使用或依赖我们的内容完全由您自行承担风险和自由裁量权。 在依赖它们之前,您应该进行自己的研究,审查,分析和验证我们的内容。 交易是一项高风险的活动,可能导致重大损失,因此请在做出任何决定之前咨询您的财务顾问。 我们网站上的任何内容均不构成招揽或要约